Experience

NO.PROJECTCLIENTLOCATIONAMOUNTYEAR
1Construction of an Apartment Building (Three Floors, 2,798 m²) for Gianyar Police ResortGianyar PoliceSukawati, GianyarIDR 22,1 Bio2025
2“Menturus” Rubber Dam Replacement #Span 3 & # Span 4 (12 m + 16 m)Perum Jasa Tirta ISungai Brantas, Jombang, Jawa TimurIDR 6,5 Bio2025
3Grant of goods in the form of building foundations and road facilities to the Bali Regional PoliceBali Regional PoliceDenpasar, BaliIDR 2 Bio2025
4Construction of Seawall, Revetment, and Cracked Cliff Stabilization at Uluwatu Temple, Kuta BaliPublic Works Agency – Badung RegencyBadung, BaliIDR 78.6 Bio2024-2025
5Package Eartwork Azure Residence (Phase 1) And Club House (Land Clearing & Development)PT Bali Riviera DevelopmentDenpasar, BaliIDR 26.5 Bio2024 - 2025
6Conservation, Arrangement, and Coastal Protection Works from Cemagi Beach to Petitenget Beach, Badung Regency (Construction of Pedestrian Bridge 61 m)Public Works Agency – Badung RegencyDenpasar, BaliIDR 13.2 Bio2024
7Replacement of rubber dam membranes, Long Storage Ayung River Rubber Dam, Bali (6,5 m)CV. Catur Dharma DiatiDenpasar, BaliIDR 2.8 Bio2024
8Optimization of the water distribution system for Indonesia Tourism Development Project (ITDP) Sembalun, East LombokMinistry of Public Works – BPPW Nusa Tenggara BaratSembalun, LombokIDR 2.9 Bio2024
9Site Clearing, Cut, Fill & Compactionand Testing For Project Medcosolar East BaliPT. Tritama Mitra LestariKarangasem, BaliIDR 1.6 Bio2024
10Water Supply System for Indonesia Tourism Development Project (ITDP) Sembalun, East Lombok (Piping System & Steel Glass Tank Reservoir)Ministry of Public Works – BPPW Nusa Tenggara BaratSembalun, LombokIDR 33.9 Bio2022-2024
11Construction of Pedestrian Bridge at Canggu (Badung Regency)Public Works Agency – Badung RegencyBadung, BaliIDR 11.9 Bio2023
12Road Pavement and Bridge Construction 35 m Width at Buruan Senganan-Pacung Junction (Tabanan Regency)Public Works of Bali ProvinceTabanan, BaliIDR 14.4 Bio2023
13Supply of Pneumatic Spillway Gate System at Nusa Dua Estuary Dam (Denpasar City)Ministry of Public Works – BWSBPDenpasar, BaliIDR 13.6 Bio2023
14River Mouth Normalization and Coastal Protection at Canggu, BaliPublic Works Agency Badung RegencyBadung, BaliIDR 15.1 Bio2022
15Land Clearing & Development at South Investment Zone of “Pusat Kebudayaan Bali”Public Works of Bali ProvinceKlungkung, BaliIDR 72.8 Bio2022
16Pulosari Raw Water Supply System (16km) and RFP Reservoar at Pemalang RegencyMinistry of Public Works – BBWS Pemali JuanaPulosari, Jawa TengahIDR 20.4 Bio2022
17Contruction of Groin B2 and B3 at Serangan IslandPT. Bali Turtle Island Development (Kura-kura Bali)Serangan, Denpasar, BaliIDR 7.7 Bio2022
18Revetment Works at Dumping 1 Benoa PortBUMN - PT. Brantas Abipraya (Persero) Tbk - Divisi Operasi 3Benoa, Denpasar, BaliIDR 4.9 Bio2021
19IPA (Water Treatment Plant) Gandrungmangu Cilacap Cap.100 L/detik (Construction of Water Supply System)Ministry of Public Works - BPPW Jawa TengahCilacap, Jawa TengahIDR 37.6 Bio2021
20“Menturus” Rubber Dam Replacement (60m + 30m)Ministry of Public Works – BBWS BRANTASSungai Brantas, Jombang, Jawa TimurIDR 11.4 Bio2021
21Main Distribution Water Pipe Line for IPA Titab Bawah Water System (7.0 km)Ministry of Public Works – BPPWPSeririt, Singaraja, BaliIDR 42.7 Bio2020-2021
22Regional Water Supply System Titab BawahPublic Works of Bali ProvinceTitab, Singaraja BaliIDR 6.2 Bio2020
23Sediment Control Works at 3 Dam (Gerogak, Telaga Tunjung and Benel Dam) – DOISPMinistry of Public Works – BWSBPGerogak Dam, Telaga Tunjung Dam, Benel Dam, BaliIDR 20.5 Bio2020
24Main Pumping Unit (185 LPS & 165 LPS) for Titab Bawah and Titab Atas Water Supply System + Main Water Pipe Line to IPA Titab Atas (5.0 km)Ministry of Public Works – BWSBPTitab Dam, Singaraja, BaliIDR 46.5 Bio2019
25Distribution Water Pipe Line at Titab Atas Water System (5.0 km) including Distribution ReservoarMinistry of Public Works – PKPAMSeririt, Singaraja, BaliIDR 16.0 Bio2019
26IPA (Water Treatment Plant) Titab Bawah Cap. 250 LPS (Construction of Water Treatment Plant,Main Reservoar, Chemical & Disinfectant system, Water Treatment Process Automation/SCADA)Ministry of Public Works – PKPAMSeririt, Singaraja, BaliIDR 68.3 Bio2018 -2019
27Cut & fill mud and spreading of Dredged Material at Reclamation area at Benoa PortPT. Van Oord Indonesia (Design and Dredging Benoa Port)Benoa Port, Denpasar, BaliIDR 12.7 Bio2018
28Canal Opening and Rubble Mound Groin at Serangan IslandPT. Bali Turtle Island Development (Kura-kura Bali)Serangan Island, DenpasarIDR 5.6 Bio2018
29Rubble Mound Revetment + Precast Bridge at Pererenan, Canggu BeachPublic Works Agency – Badung RegencyCanggu, Badung, BaliIDR 10.4 Bio2018
30Basement Excavation and Removal of TransStudio Mall, BaliPT. PP Persero – Div. Gedung IDenpasar, BaliIDR 1.5 Bio2018
31Improvement of IPA Penet – IPA Waribang and IPA Blusung (Water Treatment Plant) (Construction of new Sand Filter, Main Distribution Pipe, Disinfectant with Electro chlorinator System and Water Treatment Process Automation/SCADA)Ministry of Public Works – PKPAMDenpasar - Badung, BaliIDR 14.7 Bio2017
32Improvement of IPA Estuary (Water Treatment Plant) – PDAM Badung (Construction of new Sand Filter, Replacement of Plate Settler and Water Treatment Process Automation/SCADAPublic Works Agency – Badung RegencyBadung, BaliIDR 13.9 Bio2017
33Water Reservoir at STP and Pecatu, South KutaPublic Works of Badung Regency (PT. PAP as member of JV)Badung, BaliIDR 10,6 Bio2017